Prep the area by covering any openings that won’t be sealed. This includes taping or covering any designed openings or finished horizontal surfaces within the space. Emitters are then set up throughout the area to be air sealed.
The AeroBarrier Connect system is then set up. It includes a blower door, nozzle stations and hoses, a fan with lay-flat tubing, and the master control unit.